Transportable MCC's for The Macraes Mining Site

Transportable MCC's for The Macraes Mining Site required some of the most stringent seismic design due to the fact that one of them needed to be skidded around the site and the other was at an elevated position.

When tasked with designing these two structures, time and effort was spent building into the design strength, manoeuverability and also accomodating the electrical needs of the client and the electricians carrying out the install.